The Open Bottle

Interior build out of a Craft Beer Store including design build services

Chicago Tabernacle

The renovation of a turn of the century theater into a place of worship

Warren Barr Lincoln Park

Design build installation of 150 KW diesel generator and associated transfers switches, panel boards, and feeders for connection of branch circuits to the critical and life safety branches.

Ginger Ridge Apartments

Renovation of 26 multi-tenant buildings. Scope includes new exterior lighting upgrades, new campus wide camera system, fire alarm upgrades to all buildings, renovation to lower level boiler rooms and basements lighting upgrades as well.

Glenshire Nursing

Design build installation of panel boards transfer switches, feeders, and final terminations for connections of elevators and additional branch circuitry connected to the critical power branch.

Grove of Elmhurst

Install receptacles connected to the critical power branch circuits to accommodate new ventilator rehab wing.

Markham Park Elementary School

Service upgrade to 1600 A to accommodate future HVAC power requirements. Scope includes a directional boring for utility feeder and grounding matrix.